America class Amphibious Assault Ship LHA US Navy (2024)

The America-class (formerly the LHA(R) class) is a ship class of landing helicopter assault (LHA) type amphibious assault ships of the United States Navy (USN). The class is designed to put ashore a Marine Expeditionary Unit using helicopters and MV-22B Osprey V/STOL transport aircraft, supported by AV-8B Harrier II or F-35 Lightning II V/STOL aircraft and various attack helicopters. The first of these warships was commissioned by the U.S. Navy in 2014 to replace USS Peleliu of the Tarawa class; as many as eleven will be built. The design of the America class is based on that of USS Makin Island, the last ship of the Wasp class, but the "Flight 0" ships of the America class will not have well decks, and they have smaller on-board hospitals in order to give more space for aviation uses.

Although they only carry helicopters and V/STOL aircraft, USS America, with a displacement of about 45,000 long tons (46,000 t), is similar in size to the French Charles de Gaulle and the Indian Vikramaditya fixed-wing aircraft carriers. Also, while more than 120 feet (37 m) shorter, they are of comparable displacement to the former US Navy Midway-class aircraft carriers.

USS America can be used as a small aircraft carrier with a squadron of jet fighters plus several multipurpose helicopters, such as the MH-60 Seahawk. It can carry about 20 AV-8Bs, F-35Bs, or a mixture of the two, but the future ships of this class, starting with USS Bougainville (LHA-8), will have smaller aircraft hangars to leave room for larger amphibious warfare well decks.

Design:
America is based on the design of USS Makin Island, herself an improved version of the Wasp-class amphibious assault ships with gas turbine power. About 45 percent of the "Flight 0" design of this class is based on that of Makin Island, but with her well deck omitted to allow more room for aircraft, their spare parts and weapons, and their fuel. The gas turbines of Makin Island, America, and her possible successors use JP-5 fuel which is the same fuel used by their helicopters, the jet engines of their AV-8B Harrier and MV-22 Osprey fixed-wing aircraft and, in future ships, the gas turbines of the Landing Craft Air Cushions (LCACs) that they could carry in their well decks. This commonality greatly simplifies the storage, distribution, and use of the fuels.

The typical aircraft complement for the first two vessels is expected to be 12 MV-22B Osprey transports, six F-35B Lightning II STOVL multirole jet aircraft, four CH-53K heavy transport helicopters, seven AH-1Z/UH-1Y attack/utility helicopters, and two Navy MH-60S "Knighthawks" for air-sea rescue. The exact make-up of the ship's aircraft complements will vary according to her mission. She can carry about 20 AV-8Bs or F-35Bs, and two MH-60Ses to serve as a small aircraft carrier as demonstrated by Landing Helicopter Dock (LHD) operations in Operation Iraqi Freedom.

The U.S. Marine Corps is now more concerned about anti-ship missile attacks from fast attack craft and long-range precision fires from land. To counter such attacks the Commandant of the Marine Corps, General David H. Berger wants to keep amphibious ships farther offshore. For this Marines would be sent ashore in long-ranged MV-22 V/STOL aircraft. The MV-22 is significantly larger than the largest helicopters used by the U.S. Marine Corps and the U.S. Navy in the past. To accommodate these requirements, America has twice the displacement of the retired Iwo Jima-class amphibious assault ships.

The America-class amphibious assault ships are engineered with a hybrid-electric propulsion system derived from the one used on Makin Island. The ships can use gas-turbines for high speeds and the diesel-electric engines when operating in situations that require lower speeds like close to shore. Setting the beam of America at 106 feet (32 m) was dictated by the need for these ships to pass through the Panama Canal. The Congressional Budget Office found that if before 2040 the price of oil reached and remained above $140 per barrel then the use of nuclear propulsion for LH(X)-class ships would be more cost-effective.

A modified version of the design of America, designated the MPF(F), LHA(R), or T-LHA(R), was proposed for two ships of the Maritime Prepositioning Force (Future). The MPF(F) is the Navy's concept for a "sea base" to support operations ashore starting in about 2025. These two ships would hypothetically be manned by a civilian crew from the Military Sealift Command and not armed with weapons. Funding for the MPF(F) and the LHA(R) was tabled by the Senate Armed Services Committee in the fiscal year 2008 budget. The U.S. Navy now intends to buy more ships of the America class for its fleet of amphibious warfare ships.

The so-called "LHX" was a warship that was proposed in the late 1990s to replace the Tarawa-class amphibious assault ships, but with a dry deck for hovercraft rather than a floodable "well deck". After 2000, the LHX, the so-called "Amphibious Assault Ship Future Replacement", was put forward to replace all of the LHDs. The new LHX could be a Flight 2 design of the America class built with a well deck and a smaller island superstructure, which would give it 20 percent more capacity on the flight deck. This would remove the current restriction on MV-22s to land on spots 5 and 6, and also giving room for four MV-22B, three F-35B Lightning IIs, or three CH-53Ks to use the flight deck. In 2008, the procurement of Flight 2 ships was tentatively planned for 2024, but that might not be practical or affordable by then.

In January 2014, the U.S. Navy began taking measures on America in order to reduce damage from excessive heat given off by the F-35B and MV-22 to prolong the life of the flight deck. The F-35B engine gives off much more heat than the previous AV-8B Harrier STOVL fighter and the MV-22 Osprey's heat exhaust has been known to damage flight decks. Plans include 14 different modifications to the ship and limiting the number of flight operations that are conducted off the deck. The U.S. Navy is looking for cost-effective solutions that will not affect the combat effectiveness of America. Restricting the number of flight operations is not expected to decrease its usefulness as amphibious assault ships are made to support quick assaults, while full-sized aircraft carriers have the mission of conducting sustained air operations. Lessons learned from these measures will be applied to Tripoli and Bougainville under construction, which will allow them to perform "complete unrestricted operations." Minor modifications to America are as small as putting covers over life rafts and refueling stations and moving antennas.

Well deck:
Further warships in this class will have a well deck for amphibious warfare in their sterns to contain landing craft, such as the Landing Craft Air Cushion (LCAC), as in Tarawa-class LHAs and Wasp-class amphibious assault ships.

The addition of a well deck will leave less space for aircraft on board the ships, but the "Early Operational Assessment" of 2005 criticized the "Flight 0" design because the expanded aviation facilities gave no space for a well deck. Also, USS America has reduced stowage space for military vehicles, and the size of her hospital was reduced by two-thirds with respect to the Wasp-class ships.

Before he became the Under Secretary of the Navy, Robert O. Work also brought into question the usefulness of an amphibious warfare ship without a well deck. The concept of the Landing Platform Helicopter (LPH) had failed when their helicopters met enemy anti-aircraft systems off the coast of Lebanon during the late 1970s. In that case, Marines first had to be moved onto ships that had well decks.

The third ship of the class (USS Bougainville (LHA-8)) will be the first in its class with a well deck for deploying amphibious vehicles. While there was emphasis on lighter ground vehicles in the late 1990s, up-armored and heavier vehicles were used during operations in Iraq and Afghanistan. Future counterinsurgency operations require ships that can carry and deliver those vehicles, including through use of shore connectors; cargo lift requirements are met more expensively by aircraft airlifting equipment. Adding the well deck will require the ship's island to be slightly smaller compared to its two predecessors. Early design work with funds will begin in 2015, detailed design work and construction will start in 2017, and the LHA-8 will enter service in 2024.

source: wikipedia

America class Amphibious Assault Ship LHA US Navy (2024)

FAQs

What is a US Navy LHA? ›

Landing helicopter assault (LHA) is the United States Navy's hull classification symbol for the general-purpose helicopter-carrying amphibious assault ships of the Tarawa and America classes.

How many amphibious assault ships are in the US Navy? ›

Today, the Navy has 31 amphibious ships — what the Marine Corps considers the bare minimum it needs — but the Pentagon plans to shrink the fleet below that number in fiscal 2024. As a result, Turner anticipates the Corps will be more challenged to respond to global crises.

What does LHA stand for in the Navy? ›

The America class (formerly the LHA(R) class) is a ship class of landing helicopter assault (LHA) type amphibious assault ships of the United States Navy (USN).

What is the difference between Navy LHA and LHD? ›

Key differences between LHA 6 and the LHD class ships include an enlarged hangar deck, enhanced aviation maintenance facilities, increased aviation fuel capacity, additional aviation storerooms, removal of the well deck, and an electronically reconfigurable C4ISR suite.

What rank commands an amphibious assault ship? ›

Captain (CAPT, O6): Serves as Commanding Officers of Major Commands such as Aircraft Carriers, Amphibious Assault Ships, Cruisers, Destroyer Squadrons, Carrier Air Wings, Ballistic Missile Submarines, Submarine Squadrons, SEAL Groups and major shore installations.

What do Navy Amphibious Ready Group ships do? ›

The Navy also includes 10 amphibious ready groups (ARGs)—sets of three amphibious ships that transport Marine Corps ground and air units when they are deployed.

What is the difference between an aircraft carrier and an amphibious assault ship? ›

The role of the amphibious assault ship is fundamentally different from that of a standard aircraft carrier: its aviation facilities have the primary role of hosting helicopters to support forces ashore rather than to support strike aircraft.

How many troops can an amphibious assault ship carry? ›

Amphibious Assault Ships (LHA/LHD)

Each can carry 1,870 troops as well as a variety of air and landing craft.

What is the mission of the amphibious assault ship? ›

Index. Multi-Purpose Amphibious Assault ships are the largest amphibious ships in the world. The LHDs mission is to conduct prompt, sustained combat operations at sea, as part of the the Navy's amphibious strategy.

How big is the crew on a LHA ship? ›

The ships have a crew of 1,204 and can transport up to 1,800 troops and their equipment. America (LHA 6) is nearly three football fields in length and is 20 stories high from its keel to the top of her deckhouse. The flight deck dimension is more than two acres for launching, landing and stowing aircraft.

Can amphibious assault ships go on land? ›

An amphibious warfare ship (or amphib) is an amphibious vehicle warship employed to land and support ground forces, such as marines, on enemy territory during an amphibious assault.

Why are amphibious ships called gators? ›

These ships carry Marines along with their aircraft, equipment, and supplies to conduct assaults on hostile shores. Used as a symbol of ferocity and strength on both land and sea; the alligator further denotes the amphibious function of the vessel.

Does an LHA have a well deck? ›

LHA-6 and LHA-7 do not have well decks, which are traditionally used to move large volumes of heavy equipment needed for amphibious operations. LHA-8 and later ships will have a well deck.

How long does it take to build a LHA? ›

LHA Facts. Like their LHD predecessors, LHAs are 844 feet long with a 106-foot beam displacing more than 44,000 tons. These capital ships take more than five years to build.

What is the LHA 8 program? ›

The LHA 8 will serve as the primary command ship and aviation platform for an Amphibious Ready Group equipped with the Ship Self-Defense System, the primary control and decision system that integrates air search radars, trackers, an electronic warfare system, and hard-kill and soft-kill weapons to provide self-defense ...

What is the name of the LHA 10? ›

SECNAV Names Future America-class Amphibious Assault Ship USS Helmand Province. Secretary of the Navy Carlos Del Toro announced that a future America-class amphibious assault ship will be named USS Helmand Province (LHA 10).

Top Articles
Latest Posts
Article information

Author: Lilliana Bartoletti

Last Updated:

Views: 5340

Rating: 4.2 / 5 (73 voted)

Reviews: 80% of readers found this page helpful

Author information

Name: Lilliana Bartoletti

Birthday: 1999-11-18

Address: 58866 Tricia Spurs, North Melvinberg, HI 91346-3774

Phone: +50616620367928

Job: Real-Estate Liaison

Hobby: Graffiti, Astronomy, Handball, Magic, Origami, Fashion, Foreign language learning

Introduction: My name is Lilliana Bartoletti, I am a adventurous, pleasant, shiny, beautiful, handsome, zealous, tasty person who loves writing and wants to share my knowledge and understanding with you.